Nizhny Novgorod Institute of Applied Technologies

Works of any complexity in the energy sector

In Energy industry of Russia since 2015

Request a quote for energy industry services

Enter your name
Enter your phone number

Company Overview

NNIAT LLC renders FEED services, executes construction and installation works, commissioning works, performs upgrade of substations, reconstruction of overhead (cable) power transmission lines of 0,4kV to 35-220kV, 330kV and more, fiber-optic communication lines, as well as renders design supervision services.

Work specifics

36 completed projects
60 specialists
14 positive feedback

Work performance methods comply with applicable legal requirements.

Works do not violate land plot urban development plans.

What works do we execute

Development of initial permit documentation
Obtaining technical specifications from third parties
Surveying
Feasibility Study design
Design supervision
Facility registration
Land title documentation
Design assignment development
Development of key design solutions variants
Development of design estimate documentation, facility construction schedule
Turnkey construction including
  • construction, erection, erection supervision, commissioning works
  • provision of equipment and materials
  • facility handover to the acceptance committee and follow up

Licenses and documents

The right to perform works is confirmed by NNIAT LLC membership in self-regulatory organizations engaged in the preparation of design documentation, engineering surveys, construction and by the electric laboratory registration certificate

OHSAS18001
ISO14001
ISO9001
OPITO
VCA
Bureau Veritas

References

All operations were performed in accordance with the approved design and estimate documentation, in compliance with SNIP, technical specifications and regulations and within the agreed work schedule.

High quality work performance, professional expertise of the employees and fidelity to the fulfillment of liabilities under the contract, proves Nizhny Novgorod Institute of Applied Technologies LLC to be a reliable partner. We look forward to further cooperation

M.A. Moyaev — Director of "Facade Systems" LLC

Projects list

  • 2014
  • 2015
  • 2016
  • 2017
Item Name of construction facility, volume characteristics (scope of work) Type and scope of work at the facility, performed by the Bidder Client name, address and contact numbers Work period
1

Construction and installation works of instrumentation equipment and electrical installation works

Installation works for Instrumentation, controls and electrical equipment up to 10000V

JSC "Gazpromneft — Moscow Refinery"

Building 1/3, 2nd quarter, Kapotnya, Moscow

Tel / Fax:
+ 7 (495) 734-92-00

May 2014 – December 2015

2

Construction and installation site development works for the “Combined Oil Refining Unit” construction

Construction and installation site development activities for the "Combined Oil Refining Unit" construction

Rerouting of utilities outside construction site limits. Systems V-10, V-11, V-1, V-2, K-19, K-4 (Drainage and sewage system), with tie-ins into the existing pipelines.

Design and installation of construction site power supply system (4 Complete transformer substations).

Design and installation of video surveillance system.

Design and installation of temporary electric lighting.

Shifting of gasoline and diesel pipelines from pipe rack No. 2 to pipe rack No. 1.

Collection, transportation and treatment of the construction site oil-contaminated soil during the engineering preparation of the territory for the Integrated Refinery Unit construction.

JSC "Gazpromneft — Moscow Refinery"

Building 1/3, 2nd quarter, Kapotnya, Moscow

Tel / Fax:
+ 7 (495) 734-92-00

October 2014 — Until complete fulfillment of the obligations under the Contract

3

Detailed design, supply and installation of the ventilation system for the Modular building of Site Project Management office for the construction of the Combined Oil Refining Unit of JSC "Gazpromneft-Moscow Refinery"

Detailed design of inlet ventilation system, including power supply, automation, filtration and intake air preheat systems, for the Modular building of Site Project Management office for the construction of the Integrated Refinery Unit; procurement, supply, installation and precommissioning of the ventilation system.

JSC "Gazpromneft — Moscow Refinery"

Building 1/3, 2nd quarter, Kapotnya, Moscow

Tel / Fax:
+ 7 (495) 734-92-00

November 2014 – March 2016

Item Name of construction facility, volume characteristics (scope of work) Type and scope of work at the facility, performed by the Bidder Client name, address and contact numbers Work period
1

Works for the project "Construction of a 35 kV "Lenta" substation with a 35 kV and 10 kV overhead line to ensure technological connection of the power receivers of "Lenta" shopping center in Inozemtsevo" to the electrical network of "Stavropolenergo", a branch of PJSC "IDGC of Northern Caucasus"

Works for the project "Construction of a 35 kV "Lenta" substation with a 35 kV and 10 kV overhead line to ensure technological connection of the power receivers of "Lenta" shopping center in Inozemtsevo" to the electrical network of "Stavropolenergo", a branch of PJSC "IDGC of Northern Caucasus"

PJSC "Interregional Distribution Grid Company of Northern Caucasus" (PJSC "IDGC of Northern Caucasus")

September 2015 – April 2016

Item Name of construction facility, volume characteristics (scope of work) Type and scope of work at the facility, performed by the Bidder Client name, address and contact numbers Work period
1

Electrical installation works in accordance with the Replacement of worn out equipment actions plan of JSC "Gazpromneft-Moscow Refinery" for 2016-2018.

Replacement of emergency lighting lamps with the lamps with built-in rechargeable batteries in CDU-3 control room. Installation of TschSU control panel and cable products to consumers in MTBE gasoline fractions pump house. D1 roads lighting (section from D-14 to D-18), D-3 (section from D-14 to D-18), D-23 (section from D-14 to D-18), D-7.

JSC "Gazpromneft — Moscow Refinery"

Building 1/3, 2nd quarter, Kapotnya, Moscow

Tel / Fax:
+ 7 (495) 734-92-00

November 2016 – September 2017

Item Name of construction facility, volume characteristics (scope of work) Type and scope of work at the facility, performed by the Bidder Client name, address and contact numbers Work period
1

Works on the construction of a rack for light oil loading into vehicles for JSC "Gazpromneft-Moscow Refinery"

Performing works on the construction of a rack for light oil loading into vehicles for JSC "Gazpromneft-Moscow Refinery"

- preparation of the territory for the construction of a vehicle terminal;

- dismantling operations, including underground utilities dismantling;

- arrangement of external water supply and sewage networks;

- arrangement of on-site utilities;

- construction of an automated light oil loading station (loading automated system) with an additive storage area and an additive injection unit;

- construction of light oil vapor recovery unit;

- construction of the control room;

- construction of loading automated system pump house;

- construction of sites for shut-off valves of propane recovery unit, loading automated system and loading automated system pump house;

- installation of 40m3 container for emergency spills containment;

- installation of underground containers for the unloading of light oil in case of errors during the loading process;

- arrangement of storage area for a mobile calibration unit;

- installation of block boxes for preparing foamer solution;

- construction of a block box for coolant supply;

- construction of a block box for coolant preparation;

- construction of transformer substations TP-326, TP-327 and loading automated system pump house switchboard;

- installation of high mast poles (7 pcs.);

- arrangement of an area for tank trucks in line for loading;

- modernization of the accumulative platform of tank trucks;

- arrangement of temporary parking for loaded tank trucks;

- fencing installation and landscaping.

JSC "Gazpromneft — Moscow Refinery"

Building 1/3, 2nd quarter, Kapotnya, Moscow

Tel / Fax:
+ 7 (495) 734-92-00

May 2017 – December 2018

2

Contracted works for the project "Expansion with reconstruction of 35/10kV "Arkhyz" Substation" for PJSC "IDGC of Northern Caucasus" — "Karachayevo-Cherkessenergo"

Works for the project : "Expansion with reconstruction of 35/10 kV "Arkhyz" Substation" for "Karachayevo-Cherkessenergo", a branch of PJSC "IDGC of Northern Caucasus"

PJSC "IDGC of Northern Caucasus" — "Karachayevo-Cherkessenergo"

May 2017 – December 2018

3

Construction, installation and commissioning works on the reconstruction of 110kV overhead line "Serpukhov-Zapovednik with tapping", 35 kV overhead line "Serpukhov-reka", 5 commissioning and start-up complex for "South Electric Grid", a branch of PJSС "MOESK"

Construction, installation and commissioning works on reconstruction of 110 kV, 35 kV overhead lines for "South Electric Grid", a branch of PJSC "MOESK" ("Moscow United Electric Grid Company"):

- dismantling of 110 kV, 35 kV overhead lines of a total length of 8.9 km (dismantling of cables, overhead ground-wire cables, reinforced concrete and steel supports — 73 pcs.);

- cutting and surfacing of road pavement;

- arrangement of temporary access roads;

- dismantling and laying of buried cable lines of 0.4-10 kV to remove them from the overhead lines construction area;

- construction of 110 kV and 35 kV overhead lines of a total length of 9 km (early earthworks, installation of metal and precast concrete foundations for supports, installation of multisided and stayed poles - 45 pcs., suspension of wires and cables);

- sheet pile pits shoring;

- arrangement of complex crossings over electric railway and highway;

- installation of fiber optic cable (suspension of overhead ground-wire cables, optical cable, laying of fiber optic cables in the pipeline);

- commissioning works (phasing of the electric power line, resistance measurement, testing of the supporting insulator, power cable);

- rehabilitation of disturbed lands.

"South Electric Grid" — a branch of PJSC "MOESK"

December 2017 – March 2019

География деятельности География деятельности

NNIAT globally

Including all member states European Union

Request a quote for energy industry services

Enter your name
Enter your phone number
Still have questions about the service?

You can read more on the service page, or just contact us, and we will provide you with all the necessary information

+7 (831) 460-32-59 +7 (831) 460-41-85